National house adornment decorates engineering construction standard (14)

From;  Author:Stand originally


Horizontal take one's place should hold when shop of brick of ④ stone material, ground is stuck, make its and mortar felt close together with rubber hammer tat, adjust its surface flatness to reach at the same time seam wide.

After ⑤ shop is stuck, answer to clear in time the surface, 24h hind applies 1:1Grout fill is seamed, the dye with choice and ground consistent color and white cement are blended even hind embed seam.

Outfit of shop of floor of 14.3.2 bamboo, real wood should accord with following regulation:

Error of flatness of ① basic level must not be more than 5mm.

Moistureproof processing should undertake to basic level before ② shop is installed, besmear of moistureproof layer appropriate brushs waterproof coating or laid plastic film.


Before ③ shop is installed, should undertake choosing matching to the floor, the floor that appropriate is close to grain, color is used centrally at a room or place.

④ wood keel should join with basic level firm, fixed dot span must not be more than 600mm.

⑤ wool floor should become 30° with keel or 45° spreads a hammer, board seam should be 2 ~ 3mm, the juncture of adjacent board should stagger.

⑥ is in on keel when floor of direct shop outfit, the span of keel of primary and secondary should decide according to the computation of long wide modulus of the floor, floor juncture should be on the central line of keel.

Appropriate of length of ⑦ floor hammer is board 2.5 times thick, the head of a nail should be bungled flat. When securing, answer to tilt from horn of 30° of sunken tenon edge nail. Hardwood floor should first bore, bore diameter should be less than a floor to nail a diameter slightly.

The gap that has 8 ~ 10mm should leave between ⑧ wool floor and floor and wall.

⑨ floor burnishs should be ground after dig first, grinding should arrange wooden grain direction, grinding gross should be controlled inside 0.3 ~ 0.8mm.

The basic level of ⑩ monolayer straight floor must level off, without smeary. Before the shop is stuck, one should be brushed in basic level thin and the bottom glue of divide evenly in order to enhance felt power. The basic level when the shop is stuck and floor the reverse side all should brush glue, wait for shop of travel of the reentry after sticking a hand to stick. Block of mat of hammer of the application when makeup is beaten close together, board seam must not be more than 0.3mm. The glue fluid that spill over should clear in time clean.

Outfit of compound floor shop should accord with 14.3.3 aggrandizement following regulation:

Layer of ① moistureproof mat should spread level completely, juncture place must not be folded pressure.

Groove face answers to rely on a wall when ② installs the first. The gap that has 8 ~ 10mm should leave between floor and wall.

When ③ room length or width exceed 8m, should install in proper place adjustable seam.